Turning Japanese

Crossposted from The Stars Hollow Gazette

Culture of Complicity Tied to Stricken Nuclear Plant

By NORIMITSU ONISHI and KEN BELSON, The New York Times

Published: April 26, 2011

Despite a new law shielding whistle-blowers, the regulator, the Nuclear and Industrial Safety Agency, divulged Mr. Sugaoka’s identity to Tokyo Electric, effectively blackballing him from the industry. Instead of immediately deploying its own investigators to Daiichi, the agency instructed the company to inspect its own reactors. Regulators allowed the company to keep operating its reactors for the next two years even though, an investigation ultimately revealed, its executives had actually hidden other, far more serious problems, including cracks in the shrouds that cover reactor cores.

Investigators may take months or years to decide to what extent safety problems or weak regulation contributed to the disaster at Daiichi, the worst of its kind since Chernobyl. But as troubles at the plant and fears over radiation continue to rattle the nation, the Japanese are increasingly raising the possibility that a culture of complicity made the plant especially vulnerable to the natural disaster that struck the country on March 11.



A 10-year extension for the oldest of Daiichi’s reactors suggests that the regulatory system was allowed to remain lax by politicians, bureaucrats and industry executives single-mindedly focused on expanding nuclear power. Regulators approved the extension beyond the reactor’s 40-year statutory limit just weeks before the tsunami despite warnings about its safety and subsequent admissions by Tokyo Electric, often called Tepco, that it had failed to carry out proper inspections of critical equipment.

The mild punishment meted out for past safety infractions has reinforced the belief that nuclear power’s main players are more interested in protecting their interests than increasing safety. In 2002, after Tepco’s cover-ups finally became public, its chairman and president resigned, only to be given advisory posts at the company. Other executives were demoted, but later took jobs at companies that do business with Tepco. Still others received tiny pay cuts for their role in the cover-up. And after a temporary shutdown and repairs at Daiichi, Tepco resumed operating the plant.



In Japan, the web of connections between the nuclear industry and government officials is now popularly referred to as the “nuclear power village.” The expression connotes the nontransparent, collusive interests that underlie the establishment’s push to increase nuclear power despite the discovery of active fault lines under plants, new projections about the size of tsunamis and a long history of cover-ups of safety problems.

Sound like anyplace we know?

4 comments

Skip to comment form

  1. that with a straight face is hilarious.   Of course, I don’t really read that rag anymore, since they started trying to charge, for the tenth time or something. Good look on that.  

Comments have been disabled.